The front of the house now has all of the bricks in place, and the garage floor has been leveled out.
We have had a few problems with power points and so on being missed off of the final plans, and not being installed. Luckily we managed to catch that before the plasterboard went up so that was easily fixed – an another couple of points added. I’m sure that once we move in we will find that we are still short!
Move in date is looking like being at the end of November.