Sorry – it’s been a little time between updates.
Last week we found that the walls inside were finished – plastering was finished, and cornices and most of the architrave fitted. The doors, internal and external had been delivered, and the shelves and rails in the wardrobes installed.
This week work had started on the steps down into the back garden outside from the laundry and the family room.
The kitchen cabinets are still about two to three weeks away, so it looks like not a lot is going to happen for a couple of weeks – but we are still hoping to have moved in before Christmas.